Duba Wind Cluster

Maximo · plannedSynthetic data

Executive overview

Remote assets, lean crews

Eighty-four turbines across three ridges, managed by a small central team. Condition monitoring and work-order triage matter more than wrench time.

Operating pictureFour sources · one canonical layer

S/4HANA adapter implemented · ECC, Maximo and Oracle planned. Source vs canonical difference is modelled in this synthetic demo.

Asset availability

95.6%

1.6 pts vs 94% target

Maintenance cost / RAV

1.36%

1.04 pts under target

Unplanned downtime loss

SAR 234k

9 hrs last month

PM compliance

83.3%

-1.7 pts vs 85% target

Statutory backlog

0

clear

Availability trend

Teal actual · target 94%. Drag the lever to add the amber scenario.

83%
55%90% · target 85%
Baseline · drag to model PM recovery

Illustrative model · not a live forecast

Priority mix

Open notifications by priority.

3 critical · 7 high awaiting triage

Top bad actors

Ranked by downtime cost over the last 12 months.

Reliability

Swipe to see all columns →

AssetCriticalityFailuresDowntimeCost
WTG-31 ConverterB878 hSAR 2.0M
WTG-12 GeneratorA757 hSAR 1.3M
WTG-77 AnemometerC745 hSAR 1.0M
WTG-18 Pitch SystemA530 hSAR 696k
WTG-44 TransformerC428 hSAR 618k
More analysis2 viewsOpen

Cost and PM compliance

Monthly maintenance spend against PM completion.

Unplanned downtime

9 hours last month · SAR 234k estimated loss