Asset availability
95.8%
1.8 pts vs 94% target
Eastern Province, Saudi Arabia
Executive overview
A 400 MW combined-cycle plant in a fast-start role. Availability and heat-rate sensitivity make every unplanned trip expensive.
canonical · 77% PM
canonical · 63% PM
canonical · 74% PM
canonical · 83% PM
S/4HANA adapter implemented · ECC, Maximo and Oracle planned. Source vs canonical difference is modelled in this synthetic demo.
Asset availability
95.8%
1.8 pts vs 94% target
Maintenance cost / RAV
3.14%
0.74 pts over target
Unplanned downtime loss
SAR 1.1M
15 hrs last month
PM compliance
76.7%
-8.3 pts vs 85% target
Statutory backlog
1
action required
Teal actual · target 94%. Drag the lever to add the amber scenario.
Illustrative model · not a live forecast
Open notifications by priority.
4 critical · 10 high awaiting triage
Ranked by downtime cost over the last 12 months.
Swipe to see all columns →
| Asset | Criticality | Failures | Downtime | Cost |
|---|---|---|---|---|
| GT-1 Compressor | A | 8 | 58 h | SAR 3.1M |
| HRSG-2 Superheater | B | 5 | 37 h | SAR 2.2M |
| HRSG-1 Economiser | B | 7 | 36 h | SAR 1.8M |
| Cooling Water Pump A | C | 6 | 25 h | SAR 1.7M |
| GT-2 Compressor | A | 2 | 13 h | SAR 910k |
Monthly maintenance spend against PM completion.
15 hours last month · SAR 1.1M estimated loss