Yanbu Coal Station

SAP S/4 · implementedSynthetic data

Executive overview

High backlog, hard-working assets

A 1,320 MW coal station running two supercritical units. The maintenance team is fighting a 27-day PM backlog while keeping availability above 90%.

Operating pictureFour sources · one canonical layer

S/4HANA adapter implemented · ECC, Maximo and Oracle planned. Source vs canonical difference is modelled in this synthetic demo.

Asset availability

90.9%

-3.1 pts vs 94% target

Maintenance cost / RAV

2.29%

0.11 pts under target

Unplanned downtime loss

SAR 4.0M

34 hrs last month

PM compliance

63.1%

-21.9 pts vs 85% target

Statutory backlog

4

action required

Availability trend

Teal actual · target 94%. Drag the lever to add the amber scenario.

63%
55%90% · target 85%
Baseline · drag to model PM recovery

Illustrative model · not a live forecast

Priority mix

Open notifications by priority.

9 critical · 20 high awaiting triage

Top bad actors

Ranked by downtime cost over the last 12 months.

Reliability

Swipe to see all columns →

AssetCriticalityFailuresDowntimeCost
Boiler Feed Pump AA539 hSAR 4.0M
ID Fan 1C748 hSAR 3.9M
Turbine Lube Oil PumpC630 hSAR 3.6M
Primary Air Fan 2B531 hSAR 3.1M
Boiler Feed Pump BA328 hSAR 2.9M
More analysis2 viewsOpen

Cost and PM compliance

Monthly maintenance spend against PM completion.

Unplanned downtime

34 hours last month · SAR 4.0M estimated loss