Active permits
4
Tabuk Province, Saudi Arabia
Permits & safety
Open permits, status and the issue-to-closure cycle.
Active permits
4
Overdue
1
Awaiting return
1
Average cycle
30.1 h
Overdue first, then oldest open permits. Filter by age; swipe the table for all columns.
Filter · updates the table below
Swipe to see all columns →
| Permit | Asset | Type | Status | Age | Issued by |
|---|---|---|---|---|---|
| PTW-884 | WTG-31 Converter | Cold work | Overdue | 5 d | Blade Services |
| PTW-885 | WTG-38 Blade A | Line breaking | Active | 12 d | Logistics |
| PTW-880 | WTG-07 Gearbox | Hot work | Active | 10 d | Operations |
| PTW-883 | WTG-23 Yaw Drive | Work at height | Active | 10 d | SCADA |
| PTW-881 | WTG-12 Generator | Confined space | Active | 7 d | Turbine O&M |
| PTW-882 | WTG-18 Pitch System | Electrical isolation | Awaiting return | 2 d | Electrical |
Average hours per stage.