Duba Wind Cluster

Maximo · plannedSynthetic data

Permits & safety

Permit to work

Open permits, status and the issue-to-closure cycle.

Active permits

4

Overdue

1

Awaiting return

1

Average cycle

30.1 h

Open permits

6 of 6 permits

Overdue first, then oldest open permits. Filter by age; swipe the table for all columns.

0 days
0 days14+ days
6 permits · oldest 12 days

Filter · updates the table below

Swipe to see all columns →

PermitAssetTypeStatusAgeIssued by
PTW-884WTG-31 ConverterCold workOverdue5 dBlade Services
PTW-885WTG-38 Blade ALine breakingActive12 dLogistics
PTW-880WTG-07 GearboxHot workActive10 dOperations
PTW-883WTG-23 Yaw DriveWork at heightActive10 dSCADA
PTW-881WTG-12 GeneratorConfined spaceActive7 dTurbine O&M
PTW-882WTG-18 Pitch SystemElectrical isolationAwaiting return2 dElectrical
Cycle detail1 viewOpen

Cycle time

Average hours per stage.