Asset availability
93.8%
-0.2 pts vs 94% target
Riyadh Province, Saudi Arabia
Executive overview
A three-unit thermal fleet with an ageing turbine hall. Outage planning and cost control are the constraints; the same dashboard runs on ECC data.
canonical · 74% PM
canonical · 63% PM
canonical · 83% PM
canonical · 77% PM
S/4HANA adapter implemented · ECC, Maximo and Oracle planned. Source vs canonical difference is modelled in this synthetic demo.
Asset availability
93.8%
-0.2 pts vs 94% target
Maintenance cost / RAV
2.43%
0.03 pts over target
Unplanned downtime loss
SAR 3.8M
40 hrs last month
PM compliance
73.9%
-11.1 pts vs 85% target
Statutory backlog
6
action required
Teal actual · target 94%. Drag the lever to add the amber scenario.
Illustrative model · not a live forecast
Open notifications by priority.
6 critical · 14 high awaiting triage
Ranked by downtime cost over the last 12 months.
Swipe to see all columns →
| Asset | Criticality | Failures | Downtime | Cost |
|---|---|---|---|---|
| Turbine 3 HP Rotor | A | 8 | 80 h | SAR 6.2M |
| Feed Pump 4B | B | 7 | 62 h | SAR 5.6M |
| Boiler 5 Economiser | A | 8 | 52 h | SAR 5.0M |
| Condenser Vacuum Pump | B | 6 | 50 h | SAR 4.0M |
| Feed Pump 3A | B | 4 | 38 h | SAR 2.9M |
Monthly maintenance spend against PM completion.
40 hours last month · SAR 3.8M estimated loss