Al-Kharj Thermal Station

SAP ECC · plannedSynthetic data

Permits & safety

Permit to work

Open permits, status and the issue-to-closure cycle.

Active permits

4

Overdue

1

Awaiting return

1

Average cycle

30.1 h

Open permits

6 of 6 permits

Overdue first, then oldest open permits. Filter by age; swipe the table for all columns.

0 days
0 days14+ days
6 permits · oldest 14 days

Filter · updates the table below

Swipe to see all columns →

PermitAssetTypeStatusAgeIssued by
PTW-884Feed Pump 4BCold workOverdue1 dC&I
PTW-880Turbine 3 HP RotorHot workActive9 dOperations
PTW-885Condenser Vacuum PumpLine breakingActive5 dAsh Handling
PTW-881Turbine 4 HP RotorConfined spaceActive3 dBoiler
PTW-883Feed Pump 3AWork at heightActive2 dElectrical
PTW-882Boiler 5 EconomiserElectrical isolationAwaiting return14 dTurbine
Cycle detail1 viewOpen

Cycle time

Average hours per stage.